tricky1961
Well-Known Member
- Joined
- Jan 7, 2014
- Messages
- 49
- Reaction score
- 1
hi all here is the first pic of the the start of the rebuild,first we had to strengthen the frame around the swing arm mount as the weld let go n the previous owner kept rideing it n started to flog out and one of the top eng mounts had cracked so we ground it out slightyl n welded it as well ,we than repainted the frame n swingarm foot pegs n mount n stand in silver and clear coated it we replaced the needle roller bearings as they were rusted up and replaced the head stock bearings, we got a brand new unused damaged wireing harness from a shop in melbourne the wires that run to the swich on the frnt brake lever had been crushed n 1 wire broken which is now repaired n carnt pick it,it came with the cdi unit rectifyer and starter solinoid and new ignition swich with 2 keys for $25 inc reg post allso got a brand new gold 420 chain and brand new orange plastics for for $20 inc postage from the same place, my son wants a rockstar sticker kit for it to mach his rockstar helmet we resprayed the motor gloss black heat proof engine enemal and changed the rim colour from black to gold and clear coated them as well here is the first pic's more to follow as it go's back to geather