Taping Track Construction Thread
Hey guys,
Me n my mate have started to build a supercross like track on my 5 acre property on tuesday.
We got three truckloads of dirt to start off with:
and were currently using some shovels and a barrow to move and shape every thing since were too broke to hire a dingo haha.
Hopefully it should all end up something like this:
Ill have to try n explain that map that looks like it was drawn by a 3 year old(jamin_187).
That straight line up top left is the starting line and from there it goes right to the first berm which leads to a double over a run off of the dam wall. From there goes around the dam to a step-down whip jump down the dam wall which leads to another berm then a set of doubles. Then a near 180 degree berm to a tabletop then back to the dam wall which will be another berm to a double. After that another 180 berm into some sheepies, a triple and a berm which leads through a blackberry bush to a another berm to the start line. Then we do it all again!
Try and understand that!! haha
So far we have the first, second and third ramp made with the thirds downy underway...will be chuckin up some more pics tommorow and hopefully finish the downramp by friday.
Any input would be appreciated but any offers to help would be awesome!!!
Hey guys,
Me n my mate have started to build a supercross like track on my 5 acre property on tuesday.
We got three truckloads of dirt to start off with:
and were currently using some shovels and a barrow to move and shape every thing since were too broke to hire a dingo haha.
Hopefully it should all end up something like this:
Ill have to try n explain that map that looks like it was drawn by a 3 year old(jamin_187).
That straight line up top left is the starting line and from there it goes right to the first berm which leads to a double over a run off of the dam wall. From there goes around the dam to a step-down whip jump down the dam wall which leads to another berm then a set of doubles. Then a near 180 degree berm to a tabletop then back to the dam wall which will be another berm to a double. After that another 180 berm into some sheepies, a triple and a berm which leads through a blackberry bush to a another berm to the start line. Then we do it all again!
Try and understand that!! haha
So far we have the first, second and third ramp made with the thirds downy underway...will be chuckin up some more pics tommorow and hopefully finish the downramp by friday.
Any input would be appreciated but any offers to help would be awesome!!!
Last edited by a moderator: