hey,
ok so i want to do some head work on the zongshen to get some more kick into it,
so i was thinking cam, valve springs, and a mild port job and new valves
i was thinking of a g2 cam, hd springs and valves from akunar,
what i was wanting to know, is that has any one done work and/or to this type of motor, is it a BVH??? so that 23/27 valves ??
as i will most likey doing the work my self, any thing important i should know?
and are these steps right?
to remove cam,
remove head,
remove rocker pins,
undo the locking nut <<< same nut as when seting valve clearances????
remove rockers
cam should just slide out???
and when puting back together do the same way, after doing springs??
to remove springs,,
is it as simple as puting the spring clamp over the springs, clamping it and then removeing?
and i dont know how to remove valves,, any one wanna help??
ok so i want to do some head work on the zongshen to get some more kick into it,
so i was thinking cam, valve springs, and a mild port job and new valves
i was thinking of a g2 cam, hd springs and valves from akunar,
what i was wanting to know, is that has any one done work and/or to this type of motor, is it a BVH??? so that 23/27 valves ??
as i will most likey doing the work my self, any thing important i should know?
and are these steps right?
to remove cam,
remove head,
remove rocker pins,
undo the locking nut <<< same nut as when seting valve clearances????
remove rockers
cam should just slide out???
and when puting back together do the same way, after doing springs??
to remove springs,,
is it as simple as puting the spring clamp over the springs, clamping it and then removeing?
and i dont know how to remove valves,, any one wanna help??